Expolink Metro 2020
Architecture
Expolink Metro 2020
The Route 2020 comprises a 15km-long line, of which 11.8km is an elevated section and the remaining 3.2km underground. Its route is designed to cover populated areas in the city to make commutation easy for the visitors and the residents of Dubai not only during the six-month world fair but also in the future.
The 3.2km-long tunnel is located between Discovery Gardens and Green Community and has depth ranging between 12.5m and 36m.
The Route 2020 plan also includes the construction of three main power supply stations and an additional traction power supply station.
Scope of Work: +Produce the shop/detail drawings and submit to Design Department. +Bim model and clash detection. +3d model library creation. +Create submittal packages. +Coordination with respective departments.
DATE:
March, 2016
CLIENT:
Pallentesque Lacus
URL:
https:/Crosshatchs